1. Strip main and tap conductors to 5/8”(width of lug or as indicated on sealant cover).

2. Place uncut stripped main conductor into side A. (See Figure 1)

3A. Solid Conductor- Using a screwdriver, tighten set screw until it comes in contact with the solid conductor. Note location of screwdriver and continue tightening the set screw as indicated: 3/4 Turn #14-#8 Solid Copper or 1/4 Turn #14-#10 Steel Core Tracer

3B. Stranded Conductor- See table below for required torque.

Stranded Conductor

Gauge

in – lbs

14g

15

12g

20

10g

25

8g

30

6g

35


4. Place stripped tap conductor into side B, positioned as shown in Figure 2.

5. Tighten as shown in step 3A or 3B.

6. Remove sealant cover and discard.

7. Close housing, aligning conductors until housing lid is fully latched.

8. Wipe excess sealant around conductors.

9. Do not reuse. SKU# Selling Unit 90750 Bag of 5 Max. Voltage: 50V

Connector Size: 1.18” x 2.04” x 2.57”

Wire Range: #14-8 Solid Copper;

#14-6 Stranded Copper

#14-10 Steel Core Tracer Wire (CCS)

Conductor O.D. Range: .124” - .408”

image001

image003(001)

image005(001)


Features and benefits

• Waterproof and corrosion proof

• Install service line without cutting the main line

• One piece for easy installation

• Installs in one minute or less

• Designed for use with solid tracer wires

• Wire range from #14-8 Solid Copper

#14-6 Stranded Copper

#14-10 Steel Core Tracer Wire (CCS)

• High impact housing with user friendly design to prevent cuts or handling discomfort

• Use with low voltage tracer lines under 50 volts

• Pre-filled with silicone

• Approved for direct bury